How to Build a 2×4 Deck Rail on a Concrete Patio – Part 1

This project explains how to build a deck rail from scratch using pressure treated lumber and mount the rail on a concrete patio using concrete wedge anchors.

Overview

The house sits on a hillside and the basement level concrete patio lacked a deck rail, giving the house a “unfinished” look. I built a 25 inch high deck rail from scratch using pressure treated lumber and corrosion resistant wood screws. At 25 inches high the deck rail is low enough such as not to block the view and high enough to keep my dogs taking shortcuts through landscaping. The 4×4 end posts are mounted on 1/2 inch threaded concrete anchors and tied into the main 8×8 deck supports as shown here. The deck rail was painted with a redwood stain. Click on the image for a full size view.

dsc01432

Deck Rail on a Concrete Patio

The end view of the deck rail illustrates the 4×4 end post, 2×4 cap and face board construction technique. Note the Simpson Strong-Tie CPS4 black plastic post standoff at the bottom of the 4×4.

Deck Rail Construction - End View

Deck Rail Construction - End View

The Project

The deck rail enclosed most of the concrete patio, except for a ~4 foot gap between the house and the deck stairs as shown below. My dogs would run through here and mess up the pine straw. Here’s how I built a deck rail section to close the gap.

Gap between House and Deck Stairs

Gap between House and Deck Stairs

Jumping ahead – here’s the finished deck rail, ready to be stained when the weather warms up. Not the gap between the house wall and the deck rail, leaving sufficient room for painting the wall and not so narrow as to catch leaves. A ~2 inch gap between the bottom rail and concrete patio provides room for leaves to pass under when using the leaf blower.

Finished Deck Rail

Finished Deck Rail

Materials

The materials for this project are:

  1. Pressure treated 4″x4″x8′ posts
  2. Pressure treated 2″x4″x8′ boards
  3. Pressure treated 2″x2″x8′ boards for balusters – I space my baluster 3-1/2 inches apart
  4. Concrete wedge anchors – 1/2 inch diameter by 5-1/2 or 6 inches long
  5. 4×4 plastic post standoffs
  6. 3-1/2 inch and 2-1/2 inch corrosion resistant deck screws

You’ll need to measure and figure up the quantity of lumber and supplies necessary for your particular project. I begin by making a free hand drawing of the layout and measurements. Next I total up the materials to prepare a shopping list. Keep in mind how the lumber will be cut to minimize waste. It may be better to use 10- or 12 foot lengths of lumber for less waste and/or fewer joints.

The materials for this small project are laid out below after measuring and cutting the lumber:

Deck Rail Materials Ready for Assembly

Deck Rail Materials Ready for Assembly

Construction

I started by cutting the 4×4 end posts to 21 inches in length using a Dewalt Miter Saw. I can’t say enough about how useful a power Miter Saw is for making quick precise cuts at different angles. The usual statements apply when working with a saw – be careful our you’ll loose a finger! – and wear safety glasses. I always do. Honest.

Cutting the 4x4 Posts with a Miter Saw

Cutting the 4x4 Posts with a Miter Saw

The balusters are marked off at 19 inches in length on a 2x2x8 square post. At 19 inches long, I can get five (5) complete balusters from an 8 foot (= 96 inches) post with only 1 inch of waste: 19 * 5 = 95 inches. Very convenient!

Marking Off Balusters on a 2x2x8 Square Post

Marking Off Balusters on a 2x2x8 Square Post

The seven (7) balusters I needed are cut to 19 inches long:

Balusters Cut to 19 inch Length

Balusters Cut to 19 inch Length

The balusters start out with square flat ends. The miter saw is set to 35 degrees as shown below. The bottom end of the baluster will be cut at a 35 degree angle to form a drip edge to encourage water runoff. If the bottom end were left flat, water would tend to pool and encourage rot.

Baluster Drip Edge to be Cut at 35 degrees

Baluster Drip Edge to be Cut at 35 degrees

The miter saw blade is lowered with the motor off to position the blade before making the cut. I like to leave a 1/4 wide lip so as not to weaken it with sharp point. The baluster end profile will be a “blunted cheese wedge”.

Checking the Blade Position before Cutting

Checking the Blade Position before Cutting

Profile view of the baluster drip edge. Click on the image for a full size image.

Baluster Drip Edge Cut at 35 Degrees

Baluster Drip Edge Cut at 35 Degrees

The finished stack of balusters showing the bottom angle and drip edge.

Balusters with Drip Edge

Balusters with Drip Edge

This project is continued in Part 2.

Thanks for reading!

Bob Jackson

Copyright © 2012 HandymanHowTo.com   Reproduction strictly prohibited.

Related Posts

Tags: , , , , , , , , , , , , , , , , , , , , ,

2 Responses to “How to Build a 2×4 Deck Rail on a Concrete Patio – Part 1”

  1. Great project
    May 14, 2009 at 7:26 pm #

    I totally agree about buying a mitre saw (chop saw). My only regret is not buying it sooner. You just can’t come close to the accuracey and speed.
    For my light home usage I bought a cheaper Craftsman mitre saw that came with a few more options than your commercial grade Dewalt:
    Laser cutting guide – you always see where you will cut.
    Sliding arm – so you can make deep cuts like 2 x 8s.
    Attachment for a vacuum cleaner hose on the top of the blade guard.

    I was amazed at how much fine dust these powerful tools generate. So I hooked up the vac attachment to a shopvac. It catches about 70% of the saw dust. I think you would need a second vac hose and collection funnel mounted on the rear side of the cutting table to catch the remaining 30%.
    I also recommend wearing a mask in addition to goggles. Especially if cutting pressure treated or man made material. If you don’t like masks you could use a fan to blow the toxic saw dust away and downwind from your face. This provides cooling at the same time – good in the Summer.