This repair is continued from Part 3. The HVAC contractor began the work by disconnecting the old vent pipe at the first joint below the roof deck in the attic. To disconnect the pipe, just slide the retaining collar up and wiggle/lift the pipe to separate. The shiny new pipe sections are shown in this [...]
Continue reading...Wednesday, December 30, 2009
This project is continued from Part 2. The right vent stack in this photo continues to have a slow leak only when it rains. Resealing the storm collar didn’t fix the leak. I learned after the roofer resealed the vent stacks there was severe rusting under the rain cap that couldn’t be seen from the [...]
Continue reading...
Wednesday, December 30, 2009
11 Comments